IPRO 328 Midterm Progress Report
Summary of Progess
First 2 Weeks |
Following 4 Weeks |
Last 2 Weeks |
- Introduction to the IPRO by professor Nancy Hamill
- The review of previous IPRO’s work
- The organization of the group into subgroups
- Engaging in the study and research of passive solar heating
technology by sub groups
- The development of a project plan.
|
- The creation of 3D site plan for sun studies
- The development of a project website
- The research of pool covers that would provide protection
against heat loss
- The study of the proper heat collectors and placement
for the devices on site.
- The learning and studying the ret screen program for analysis
of project.
|
- The development of a structure to support the heating
collectors
- The selection of the proper heat collectors
- The studying of Energy 10 software to due more analysis.
- The schematic diagram for what equipment is need for use
in the system
- The development of the midterm report.
|
Enclosure Group:
The focus of the enclosure group is to design a secondary structure
to which to attach the thermal collectors to. The group had to decide
whether or not attach the collectors to the Keating hall structure
or to a separate structure. The group decided upon a separate structure.
The group then decided to place it outside the stands of the baseball
field to work as a shading structure for the stands as well as storage
for maintenance crew.
The Keating Hall Group:
The Keating hall group started with a focus on the pool cover as
a way to maintain heat gained. At the same time began the study
of the various types of solar collectors. They also looked into
the other equipment that would be needed to integrate the heat collected
into to the Keating hall heating system. They have also mastered
the energy ten software to analyze the collected data to make predictions
about energy savings of the system.
The Analysis Group:
The analysis group has been keeping track of the information collected
by the other two groups taking it and putting it in to programs
to calculate the potential benefits of our project. The analysis
has been focusing on the website creation and maintenance. The website
consists of the finished tasks of each of the groups. They have
also done various ret screen tests to analyze which collectors and
system which best suit the goals of the Ipro.
|