Project Plan IPRO 328
Solar thermal Technologies for Large Scale
Buildings
Expected Results
Three different teams have been created to focus on different aspects
of the project. Two teams will be working on the initial research
of the two main aspects of the project while the third team will
be doing analysis and verifying the factual nature of the predictions
made by the other two groups of the proposed design.
Keating Hall Modification Team
The selection and installation process for an insulating pool cover.
The development and installation procedure of a mechanical system
and secondary devices for the energy gathering system. The possible
application of an integrated system that can be used for cooling
in the pool incorporated in the heating system.
Enclosure Team
The integration and design a structure which a thermal solar collection
system can be incorporated in to and place it properly on the site.
Researching the possibilities for a new curtain wall system for
Keating hall that would help reduce energy load.
Analysis Team
To discover which system for solar collection has the best possible
energy capabilities. To review the proposed design of the enclosure
and Keating hall groups to discover the actual energy savings of
the design system. The use of the gathered data and discover possible
integration of the designed system into applications for commercial
spaces around Chicago. The determining of a cost analysis to see
the viability for the project to be actually created.
|