Arch 225 - CAD IN PRACTICE(Kearns)

Exercise 3

Continue documenting the existing conditions of your chosen site. If you haven’t done so already, measure pertinent elevation data in your site and draw the existing elevations of at least 2 adjacent rooms. All doors, windows, built-in millwork, etc should be included in your elevations.

After completing your elevation drawings, prepare a file for import into 3d Studio Viz and import the geometry into your initial 3d Studio Viz file created in your first assignment.

Upload your directory structure and all files to the Myron Files server. This will constitute the deadline for the first 3 assignments. From this point on, it will be assumed that all assignements will be checked for timely completion immediately following each class. Assignment files which can not be found, are incomplete, or missing will lead to a lower grade.