Publications
 

Contents
 

Refereed Papers in Journals

Refereed papers in Conference Proceedings

Proceedings, Reports, Manuals and Articles

Papers Presented at Conferences with no Proceedings
 

red-line.gif (286 bytes)

Refereed Papers in Journals

 Ozorhon, B., Arditi, D., Dikmen, I. and Birgonul, M.T., Implications of Culture in the Performance of International Construction Joint ventures, Journal of Construction Engineering and Management, ASCE, accepted for publication, 2007.

 

 Ozorhon, B., Arditi, D., Dikmen, I. and Birgonul, M.T., The Role of Organizational Culture in Construction Company Alliances, International Journal of Human Resources Development and Management, accepted for publication, 2007.

 

 Dogan, S.Z., Arditi, D. and Gunaydin, H.M., Using Decision Trees for Determining Attribute Weights in a Case-Based Model for Early Cost Detection, Journal of Construction Engineering and Management, ASCE, accepted for publication, 2007.

 

 Arditi, D. and Pattanakitchamroon, T., Analysis Methods in Time-Based Claims, Journal of Construction Engineering and Management, ASCE, accepted for publication, 2007.

 

 Ozorhon, B., Arditi, D., Dikmen, I, and Birgonul, M.T., Effect of Host Country and Project Conditions in International Construction Joint Ventures, International Journal of Project Management, accepted for publication, 2007.

 

 Ozorhon, B., Arditi, D., Dikmen, I, and Birgonul, M.T., Effect of Partner Fit in International Construction Joint Ventures, Journal of Management in Engineering, ASCE, Vol. 24, No. 1, January 2008, pp: 12-20.

 

 Algarni, A.M., Arditi, D. and Polat, G., Build-Operate-Transfer (BOT) in Infrastructure Projects in the United States, Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 10, October 2007, pp: 728-735.

 

 Arditi, D., Lee, D.-E. and Polat G., Fatal Accidents in Nighttime vs. Daytime Highway Construction Work Zones, Journal of Safety Research, Vol. 38, No. 4, 2007, pp: 399-405.

 

 Gunhan, S. and Arditi, D., Budgeting Owner's Construction Contingency, Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 7, July 2007, pp: 492-497.

 

 Gunhan, S., Arditi, D. and Doyle, J., Avoiding Change Orders in Public School Construction, Journal of Professional Issues in Engineering Education and Practice, Vol. 133, No. 1, January 2007, pp: 67-73.

 

 Polat, G., Arditi, D. and Mungen, U., A Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar, Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 1, January 2007, pp: 29-39.

 

 Tokdemir, O.B., Arditi, D. and Balcik, C., ALISS: Advanced Linear Scheduling System, Construction Management and Economics, Vol. 24, No. 12, December 2006, pp: 1253-1267.

 

 Polat, G., Arditi, D., Ballard, G. and Mungen, U., Economics of On-Site vs. Off-Site Fabrication of Rebar, Construction Management and Economics, Vo. 24, No. 11, November 2006, pp: 1185-1198.

 

 Gunhan, S. and Arditi, D., Methods of Entry into the International Construction Market, Yapi, No. 299, October 2006, pp: 82-85 (in Turkish).

 

 Dogan, S.Z., Arditi, D. and Gunaydin, H.M., Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems, Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 10, October 2006, pp: 1092-1098.

 

 Poku, S. and Arditi, D., Construction Scheduling and Progress Control Using Geographical Information Systems, Journal of Computing in Civil Engineering, ASCE, Vol. 20, No. 5, September/October 2006, pp: 351-360.

 

 Bolukbasi, M.M., Arditi, D. and Mohammadi, J., Optimum Rehabilitation Schedule of Steel Highway Bridges, Structure and Infrastructure Engineering, Vol. 2, No. 2, June 2006, pp: 141-152.

 

 Kale, S. and Arditi, D., Diffusion of ISO 9000 Certification in the Precast Concrete Industry, Construction Management and Economics, Vol. 24, No. 5, May 2006, pp: 485-495.

 

 Lee, D.-E. and Arditi, D., Automated Statistical Analysis in Stochastic Project Scheduling Simulation, Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 3, March 2006, pp: 268-277.

 

 Bolukbasi, M.M., Arditi, D. and Mohammadi, J., Deterioration of Reconstructed Bridge Decks, Structure and Infrastructure Engineering, Vol. 2, No. 1, March 2006, pp: 23-31.

 

 Arditi, D. and Pattanakitchamroon, T., Selecting a Delay Analysis Method in Resolving Construction Claims, International Journal of Project Management, Vol. 24, No. 2, February 2006, pp: 145-155.

 

 Lee, D.-E. and Arditi, D., Total Quality Performance of Design/Build Firms Using Quality Function Deployment, Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 1, January 2006, pp: 49-57.

 

 Arditi, D., Ayrancioglu, M. and Shi, J.J., Worker Safety Issues in Nighttime Highway Construction, Engineering, Construction and Architectural Management, Vol. 12, No. 5, 2005, pp: 487-501.

 

 Kale, S. and Arditi, D., Diffusion of Computer Aided Design (CAD) Technology in Architectural Design Practice, Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 10, October 2005, pp: 1135-1141.

 

 Arditi, D. and Pulket, T., Predicting the Outcome of Construction Litigation Using Boosted Decision Trees, Journal of Computing in Civil Engineering, ASCE, Vol. 19, No. 4, October 2005, pp: 387-393.

 

 Acar, E., Kocak, I., Sey, Y. and Arditi, D., Use of Information and Communication Technologies by SMEs in Building Construction, Construction Management and Economics, Vol. 23, No. 7, September 2005, pp: 713-722.

 

 Polat, G. and Arditi, D., The JIT Material Management System in Developing Countries, Construction Management and Economics, Vol. 23, No. 7, September 2005, pp: 697-712.

 

 Al-Sobiei, O. S., Arditi, D. and Polat, G., Managing Owner’s Risk of Contractor Default, Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 9, September 2005, pp: 973-978.

 

 Arditi, D. and Chotibhongs, R., Issues in Subcontracting Practice, Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 8, August 2005, pp: 866-876.

 

 Gunhan, S. and Arditi D., Foreign Market Entry Decision Model for Construction Companies, Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 8, August 2005, pp: 928-937.

 

 Gunhan, S. and Arditi , D., Factors Affecting International Construction, Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 3,  March 2005, pp: 273-282.

 

 Al-Sobiei, O.S., Arditi, D. and Polat, G., Predicting the Risk of Contractor Default in Saudi Arabia Utilizing ANN/GA Techniques, Construction Management and Economics, Vol. 23, No. 4, May 2004, pp: 423-430.

 

 Koksal, A. and Arditi, D., Predicting Construction Company Decline, Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 6, November/December 2004, pp: 799-807.

 

 Arditi, D. Ayrancioglu, M. and Shi, J., Effectiveness of Safety Vests in Nighttime Highway Construction, Journal of Transportation Engineering, ASCE, Vol. 130, No. 6, November/December 2004, pp: 725-732.

 

 Koksal A. and Arditi, D., An Input Output Model for Business Failures in the Construction Industry, Journal of Construction Research, Vol. 5, No. 1, March 2004, pp: 1-16.

 

 Arditi, D. and Lee, D.-E., Service Quality Performance of Design/Build Contractors Using Quality Function Deployment, Construction Management and Economics, Vol. 22, No. 2, February 2004, pp: 123-127.

 

 Kanoglu, A. and Arditi, D., An Integrated Automation System for Design/Build Organizations, International Journal of Computer Applications in Technology, Vol. 20, No. 1/2/3, 2004, pp: 3-14.

 

 Bolukbasi, M.M., Mohammadi, J. and Arditi, D., Estimating the Future Condition of Highway Bridge Components Using National Bridge Inventory (NBI) Data, Practice Periodical on Structural Design and Construction, ASCE, Vol. 9, No. 1, February 2004, pp: 16-25.

 

Abeid, J., Allouche, E., Arditi, D. and Hayman, M., PHOTO-NET II: A Computer Based Monitoring System Applied to Project Management, Automation in Construction, Vol. 12, No. 5, September 2003, pp: 603-616.

 

Abeid, J. and Arditi, D., PHOTO-NET: An Integrated System for Controlling Construction Progress, Engineering, Construction and Architectural Management, Vol. 10, No.3, 2003, pp: 162-171.

 

 Kale, S. and Arditi, D., Differentiation, Conformity and Construction Firm Performance, Journal of Management in Engineering, ASCE, Vol. 19, No. 2, April 2003, pp: 52-59.

 

 Arditi, D. and Lee, D.-E., Assessing the Corporate Service Quality of Design/Build Contractors Using Quality Function Deployment, Construction Management and Economics, Vol. 21, No. 2, February-March 2003, pp: 175-185.

 

 Abeid Neto, J. and Arditi, D., Time-Lapse Digital Photography Applied to Project Management, Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 6, November/December 2002, pp: 530-535.

 

 Arditi, D., Tokdemir, O.B. and Suh, K., Challenges in Line-of-Balance Scheduling, Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 6, November/December 2002, pp: 545-556.

 

 Arditi, D., Alnajjar, A. and Vingert, N., Construction Cost Estimating Support System, Cost Engineering, AACE, Vol. 44, No. 10, October 2002, pp: 17-25.

 

 Abeid, J. and Arditi, D., Linking Time-Lapse Digital Photography and Dynamic Scheduling of Construction Operations, Journal of Computing in Civil Engineering, ASCE, Vol. 16, No. 4, October 2002, pp: 269-279.

 

 Arditi, D., Sikangwan, P. and Tokdemir, O.B., Scheduling System for High Rise Building Construction, Construction Management and Economics, Vol. 20, No. 4, June 2002, pp: 353-364.

 

 Kale, S. and Arditi, D., Competitive Positioning in the U.S. Construction Industry, Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 3, May/June 2002, pp: 238-247.

 

 Yasamis, F., Arditi, D. and Mohammadi, J., Assessing Contractor Quality Performance, Construction Management and Economics, Vol. 20, No. 3, April-May 2002, pp: 211-223.

 

 Arditi, D., Elhassan, A. and Toklu, Y.C., Constructability Analysis in the Design Firm, Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 2, March/April 2002, pp: 117-126.

 

 Abeid Neto, J. and Arditi, D., Using Colors to Detect Structural Components in Digital Pictures, Computer-Aided Civil and Infrastructure Engineering, Vol. 17, No. 1, January 2002, pp: 61-67.

 Gunaydin, H.M. and Arditi, D., Chapter 26 - Cross Impact Analysis of Information Technologies and Project Management Knowledge Areas in the Building Design Process, in The Frontiers of Project Management Research, co-edited by Slevin, D.P., Cleland, D.I. and Pinto, J.K., Project Management Institute, Newtown Square, PA, 2002, pp: 435-454.

 Kurra, S. and Arditi, D., Determination of Sound Transmission Loss of Multilayared Elements Part 1: Predicted and Measured Results, Acta Acustica, Vol. 87, No. 5, 2001, pp: 582-592.

 Kurra, S. and Arditi, D., Determination of Sound Transmission Loss of Multilayared Elements Part 2: An Experimental Study, Acta Acustica, Vol. 87, No. 5, 2001, pp: 592-604.

 Kale, S. and Arditi, D., General Contractors Relationships with Subcontractors: A Strategic Asset, Construction Management and Economics, Vol. 19, No. 5, September 2001, pp: 541-549.

 Mochtar, K. and Arditi, D., Pricing Strategy in the U.S. Construction Industry, Construction Management and Economics , Vol. 19, No. 4, July 2001, pp: 405-415.

 Mochtar, K. and Arditi, D., Role of Marketing Intelligence in Making Pricing Policy in Construction, Journal of Management in Engineering, ASCE, Vol. 17, No. 3, July 2001, pp: 140-148.

 Arditi, D., Tokdemir, O.B. and Suh, K., Effect of Learning on Line-of-Balance Scheduling, International Journal of Project Management, Vol. 19, No. 5, July 2001, pp: 265-277.

 Arditi, D., Tokdemir, O.B. and Suh, K., Scheduling System for Repetitive Unit Construction Using Line-of-Balance Technology, Engineering, Construction and Architectural Management, Vol. 8, No. 2, April 2001, pp: 90-103.

 Kanoglu, A. and Arditi, D., A Computer-Based Information System for Architectural Design Offices, Construction Innovation , Vol. 1, No. 1, March 2001, pp: 15-29.

 Shi, J.J., Cheung, S.O. and Arditi, D., A Construction Delay Computation Method, Journal of Construction Engineering and Management , ASCE, Vol. 127, No. 1, January/February 2001, pp: 60-65.

 Arditi, D., Ergin, U. and Gunhan, S., Factors Affecting the Use of Precast Concrete Systems, Journal of Architectural Engineering, ASCE, Vol. 6, No. 3, September 2000, pp: 79-86.

 Tangkar, M. and Arditi, D., Innovation in the Construction Industry, Dimensi Teknik Sipil – Journal of Civil Engineering Science and Technology, Vol. 2, No. 2, September 2000, pp: 96-103.

 Arditi, D., Koksal, A. and Kale, S., Business Failures in the Construction Industry, Engineering Construction and Architectural Management, Vol. 7, No. 2, June 2000, pp: 120-132.

 Mochtar, K.and Arditi, D., Alternate Pricing Strategies in Construction, Dimensi Teknik Sipil – Journal of Civil Engineering Science and Technology, Vol. 2, No. 1, March 2000, pp: 56-64.

 Arditi, D. and Mochtar, K., Trends in Productivity Improvement in the U.S. Construction Industry, Construction Management and Economics, Vol. 18, No. 1, January-February 2000, pp: 15-27.

 Arditi, D. and Mochtar, K., Productivity Improvement in the U.S. Construction Industry, Jurnal Teknik Sipil dan Perencanaan, Vol. 1, No. 3, December 1999, pp: 1-20.

 Arditi, D. and Nawakorawit, M., Designing Buildings for Maintenance: Designers’ Perspective, Journal of Architectural Engineering , ASCE, Vol. 5, No. 4, December 1999, pp: 107-116.

 Arditi, D. and Nawakorawit, M., Issues in Building Maintenance: Property Managers’ Perspective, Journal of Architectural Engineering, ASCE, Vol. 5, No. 4, December 1999, pp: 117-132.

 Arditi, D. and Tokdemir, O.B., Using Case Based Reasoning to Predict the Outcome of Construction Litigation, Journal of Computer Aided Civil and Infrastructure Engineering, Vol. 14, No. 5, September 1999, pp: 385-393.

 Kale, S. and Arditi, D., Age-Dependent Business Failures in the U.S. Construction Industry, Construction Management and Economics, Vol. 17, No. 4, July 1999, pp: 493-503.

 Arditi, D. and Tokdemir, O.B., A Comparison of Case Based Reasoning and Artificial Neural Networks, Journal of Computing in Civil Engineering, ASCE, Vol. 13, No. 3, July 1999, pp: 162-169.

 Arditi, D. and Messiha, H.M., Life Cycle Cost Analysis (LCCA) in Municipal Organizations, Journal of Infrastructure Systems , ASCE, Vol. 5, No. 1, March 1999, pp: 1-10.

 Arditi, D. and Gunaydin, H.M., Perceptions of Process Quality in Building Projects, Journal of Management in Engineering , ASCE, Vol. 15, No. 2, March/April 1998, pp: 43-53.

 Kale, S. and Arditi, D., Business Failures: Liabilities of Newness, Adolescence and Smallness, Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 6, November/December 1998, pp: 458-464.

 Arditi, D. and Yasamis, F., Incentive/Disincentive Contracts: Perceptions of Owners and Contractors, Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 5, September/October 1998, pp: 361-373.

 Arditi, D. and Gunaydin, H.M., Factors that Affect Process Quality in the Life Cycle of Building Projects, Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 3, May/June 1998, pp: 194-203.

 Arditi, D., Oksay, F.E., and Tokdemir, O.B., Predicting the Outcome of Construction Litigation Using Neural Networks, Computer-Aided Civil and Infrastructure Engineering, Vol. 13, No. 2, March 1998, pp: 75-81.

 Arditi, D., Kale, S., and Tangkar, M., Innovation in Construction Equipment and its Flow into the Construction Industry, Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 4, December 1997, pp: 371-378.

 Arditi, D., Khisty, C.J., and Yasamis, F., Incentive/Disincentive Provisions in Highway Contracts, Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 3, September 1997, pp: 302-307.

 Arditi, D. and Gunaydin, H.M., Total Quality Management in the Home Building Process, International Journal for Housing Science and Its Applications, Vol. 21, No. 1, January 1997, pp: 1-10.

 Arditi, D. and Gunaydin, H.M., Total Quality Management in the Construction Sector, Technical Journal, Vol. 8, No. 1, January 1997.

 Arditi, D. and Tokdemir, B.O., A New Approach to Civil Engineering Applications: Case Base Reasoning, Turkish Engineering News, Vol. 42, No. 387, March 1997, pp: 36-40.

 Arditi, D. and Alifen, R., Value Engineering in Construction Management, Value World, SAVE, Vol. 19, No. 3, October 1996, pp: 1-7.

 Arditi, D. and Gunaydin, H.M., Total Quality Management in the Construction Process, International Journal of Project Management, Vol. 15, No. 4, August 1996, pp: 235-243.

 Al-Sobiei, O.S., Assaf, S. and Arditi, D., Construction Claims in Residential Projects in Saudi Arabia, International Journal of Housing Science and its Applications, Vol. 20, No. 1, 1996.

 Arditi, D. and Ferreira, E., Acquisition, Representation and Validation of Knowledge of Subjective Nature in Expert System Development, Microcomputers in Civil Engineering, Vol. 11, No. 4, July 1996, pp: 239-248.

 Arditi, D. and Bentotage, S.B., System for Scheduling Highway Construction Projects, Microcomputers in Civil Engineering , Vol 11, No. 2, March 1996, pp: 123-139.

 Arditi, D. and Messiha, H., Life-Cycle Costing in Municipal Projects, Journal of Infrastructure Systems, ASCE, Vol. 2, No. 1, March 1996, pp: 5-14.

 Arditi, D. and Mochtar, K., Productivity Improvement in the Indonesian Construction Industry, Construction Management and Economics , Vol. 14, No. 1, January 1996, pp: 13-24.

 Arditi, D. and Gunaydin, H.M., Total Quality Management, Tasarim, Vol. 6, No. 58, 1996, pp: 92-95 (in Turkish).

 Arditi, D., Khisty, C.J., and Yasamis, F., Incentive/Disincentive Provisions in Highway Contracts, Transportation Research Board, 75th Annual Meeting, Washington, DC, 7-11 January, 1996.

 Arditi, D. and Mochtar, K., Productivity in the Construction Industry, International Productivity Journal, Vol. 1995-I, Spring 1995, pp: 37-48.

 Riad, N.I., Arditi, D., and Mohammadi, J., Computerized Time Impact Analysis for Project Acceleration, Microcomputers in Civil Engineering, Vol. 10, No. 2, March 1995, pp: 131-146.

 Arditi, D. and Robinson M.A., Concurrent Delays in Construction Litigation, Cost Engineering, AACE, Vol. 37, No. 7, July 1995, pp: 20-31.

 Riad, N.I., Arditi, D., and Mohammadi, J., Integrated System for Managing Owner-Directed Project Acceleration, Journal of Construction Engineering and Management, ASCE, Vol. 120, No. 1, March 1994, pp: 77-95.

 Hisatomi, Y., Reismann, W., with the contribution of Arditi, D., Domsa, J., Schub, A., and Vos, C.J., Design and Construct: Trend, Challenge, Improvement?, Structural Engineering International , Vol. 4, No. 3, August 1994, pp: 177-182.

 Gray, J. and Arditi, D., Fire Prevention and Protection during Construction, Journal of Applied Fire Science , Vol. 4, No. 1, 1994, pp: 53-68.

 Arditi, D., Computerized Repetitive Scheduling Techniques in High Rise Building Construction, Building, February 1992, 34-38.

 Arditi, D. and Suh, K., Estimating System Selection Expert, Construction Management and Economics, Vol. 9, No. 4, July 1991, pp: 369-381.

 Arditi, D. and Suh, K., Expert System for Cost Estimating Software Selection, Cost Engineering, AACE, Vol. 33, No. 6, June 1991, pp: 9-19.

 Arditi, D. and Gutierrez, A.E., Performance of US Contractors in Foreign Markets, Construction Management and Economics , Vol 9, No. 5, September 1991, pp: 431-449.

 Arditi, D. and Gutierrez, A.E., Factors Affecting US Contractors' Performance Overseas, Journal of Construction Engineering and Management, ASCE, Vol. 117, No. 1, March 1991, pp: 27-46.

 Arditi, D. and Singh, S., Selection Criteria for Commercially Available Software in Construction Accounting, International Journal of Project Management, INTERNET, Vol. 9, No. 1, February 1991, pp: 39-44.

 Riad, N., Arditi, D., and Mohammadi, J., A Conceptual Model for Claim Management in Construction - An AI Approach, Computers and Structures, Vol. 40, No. 1, 1991, pp: 67-74.

 Catakli, M.R. and Arditi, D., An Overview of Materials Management in Construction Projects, Industrial Engineering , Vol. 2, No. 10, June 1991.

 Arditi, D., Construction Management Education in Turkey, International Journal of Construction Management, INTERNET, Invited paper, Vol.7, No. 4, May 1989, pp: 201-204.

 Arditi, D. and Patel, B.K., Expert System for Claim Management in Construction Projects, International Journal of Project Management, INTERNET, Vol. 7, No. 3, August 1989, pp: 141-146.

 Arditi, D. and Patel, B.K., Impact Analysis of Owner-Directed Acceleration, Journal of Construction Engineering and Management, ASCE, Vol. 115, No. 1, March 1989, pp: 144-157.

 Arditi, D. and Davis, L., Marketing of Construction Services, Journal of Management in Engineering, ASCE, Vol. 4, No. 4, October 1988, pp: 297-315.

 Arditi, D. and Riad, N., Commercially Available Estimating Software Systems, Project Management Journal, PMI, Vol. 19, No. 2, April 1988, pp: 65-70.

 Arditi, D. and Albulak, M.Z., Line-of-Balance Scheduling in Pavement Construction, Journal of Construction Engineering and Management, ASCE, Vol. 112, No. 3, September 1986, pp: 411-424.

 Arditi, D. and Rackas, A., Software Needs for Construction Planning and Scheduling, International Journal of Project Management, INTERNET, Vol. 4, No. 2, May 1986, pp: 91-96.

 Arditi, D., Akan, G.T., and Gurdamar, S., Reasons for Cost Overruns in Public Projects, International Journal of Project Management, INTERNET, Vol. 3, No. 4, November 1985, pp: 218-224.

 Arditi, D., Akan, G.T., and Gurdamar, S., Reasons for Delays in Public Projects in Turkey, Construction Management and Economics , Vol. 3, No. 2, Autumn 1985, pp: 171-181.

 Arditi, D. and Krieter, D.S., Railway Route Rationalization - A Valuation Model, Journal of Transportation Engineering , ASCE, Vol. 111, No. 2, March 1985, pp: 105-113.

 Arditi, D., Construction Productivity Improvement, Journal of Construction Engineering and Management, ASCE, Vol. 111, No. 1, March 1985, pp: 1-14.

 Arditi, D., Graduate Education in Construction Management, Construction Management and Economics, Vol. 2, No. 3, Winter 1984, pp: 193-199.

 Akan, G.T., Arditi, D., and Imre, M., Priority Ranking of Highway Improvement Projects, Construction Management and Economics , Vol. 2, No. 1, Spring 1984, pp: 49-55.

 Arditi, D. and Koseoglu, H., Factors Affecting Success in Network Applications in a Developing Country, Construction Management and Economics, Vol. 1, No. 1, Spring 1983, pp: 3-16.

 Arditi, D., Diffusion of Network Planning in Construction, Journal of Construction Engineering and Management , ASCE, Vol.109, No. 1, March 1983, pp: 1-12.
 

Back to top

red-line.gif (286 bytes)

Refereed Papers in Conference Proceedings

 Arditi, D., Innovative 4D Management of Construction Projects, Proceedings of the 5th International Conference on Innovation in Architecture, Engineering and Construction, Antalya, Turkey, 23-25 June 2008.

 

 Arditi, D., Managing the Risk of Contractor Default, Proceedings of the Eighth National Project Management Congress, Kadir Has University, Istanbul, Turkey, April 13-14, 2007.

 

 Ozorhon, B. and Arditi, D., Electronic Reverse Auctions in Construction Procurement, Proceedings of the Fourth International Structural Engineering and Construction Conference (ISEC-4), Melbourne, Australia, September 26-28, 2007.

 

 Gunhan, S. and Arditi, D., Foreign Market Entry Modes in Construction, Proceedings of the ASCE Construction Research Congress, ASCE and CIB, Grand Bahama Island, Bahamas, 6-8 May, 2007.

 

 Oney-Yazici, E., Arditi, D. and Uwakweh, B.O., Organizational Culture in U.S. Construction Companies, Joint International Conference on Construction Culture, Innovation and Management (CCIM), CIB and CICE, Dubai, UAE, 26-29 November, 2006.

 

 Arditi, D., Graduate Education In Construction Management, Workshop on Reforming Civil and Environmental Engineering Education Given the Societal Changes Related to Infrastructures, eduCEE’06, sponsored by NSF and TUBITAK, Istanbul, Turkey, 4-7 October 2006.

 

 Arditi, D., Artificial Intelligence in Predicting the Outcome of Construction Litigation, Invited keynote lecture, Proceedings of the Tenth East Asia-Pacific Conference on Structural Engineering and Construction, Bangkok, Thailand, 3-5 August 2006.

 

 Dogan, S.Z., Arditi, D. and Gunaydin, H.M., Comparison of ANN and CBR Models for Early Cost Prediction of Structural Systems, Proceedings of the 17th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering, K. Gürlebeck and C. Könke (Editors), Weimar, Germany, 12-14 July, 2006.

 

 Kaplanoglu, S.B. and Arditi, D., Pre-Project Peer Reviews in Construction Companies, Proceedings of the Third Construction Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005, pp: 115-122.

 

 Dogan, S.Z., Arditi, D. and Gunaydin, H.M., Comparison of GA-Augmented Neural Networks and GA-Augmented Case-Based Reasoning Models in Estimating Building Costs, Proceedings of the Third Construction Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005, pp: 286-295.

 

 Gunhan, S. and Arditi, D., External Factors Affecting Construction Companies in International Markets, Proceedings of the Third Construction Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005, pp: 78-89.

 

 Polat, G., Arditi, D. and Mungen, U., Just-in-Time Materials Management Systems in Developing Countries, Proceedings of the Third Construction Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005, pp: 263-271.

 

 Toklu, Y.C., Arditi, D. and Cotuk, A., Problems Encountered in Traditional Project Scheduling and their Solutions, Proceedings of the Third Construction Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005, pp: 272-285.

 

 Erik, E., Arditi, D. and Koksal, A., Bribing Cases in the Construction Industry, Proceedings of the Third Construction Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005, pp: 508-518.

 Arditi, D., Predicting the Outcome of Construction Litigation, Invited keynote lecture, Proceedings of the Fifth International Conference on Advances in Civil Engineering, Istanbul, Turkey, 25-27 September 2002.

 Celik, T., Arditi, D. and Abbasi, M., Labor Practices in the U.S. Construction Industry, Proceedings of the Fifth International Conference on Advances in Civil Engineering, Istanbul, Turkey, 25-27 September 2002.

 Arditi D., Goren, A. and Tangkar, M., Automation and Robotics in the Construction Industry, Proceedings of the International Conference on Advancement in Design, Construction, Construction Management and Maintenance of Building Structures, Bali, Indonesia, 27-28 March 2002.

 Arditi, D. and Siawidjaja, R. Safety Equipment in the Construction Site, Proceedings of the International Conference on Advancement in Design, Construction, Construction Management and Maintenance of Building Structures, Bali, Indonesia, 27-28 March 2002.

 Kurra, S. and Arditi, D., Variation of the Measured Sound Insulation Values for Test Walls in Two Different Sizes, Proceedings of the 17th ICA Conference , Rome, Italy, September 2001.

 Arditi, D., Recent Research in Construction Management, Invited key-note lecture, Proceedings of the Fourth International Congress on Advances in Civil Engineering, Famagusta, Cyprus, November 1-3, 2000.

 Koksal, A. and Arditi, D., Comparing Models of Construction Company Failure, Proceedings of the Fourth International Congress on Advances in Civil Engineering, Famagusta, Cyprus, November 1-3, 2000.

 Gunaydin, H.M. and Arditi, D., Impact of Information Technologies on Project Management Functions in the Building Design Process, Proceedings of the PMI Research Conference, Paris, France, June 21-24, 2000.

 Kurra, S. and Arditi, D., Sound Transmission Loss of Multilayered Elements: Comparison of Calculated and Measured Results, Proceedings of Inter.Noise 2000, the 29th International Congress on Noise Control Engineering, Nice, France, August 27-30, 2000.

 Arditi, D., Catakli, M.R., Saemundsson, G., Akyol, G. and Gunhan, S., Historical Analysis of U.S. Firms’ CM Activities in Global Markets, Proceedings of the Civil and Environmental Engineering Conference – New Frontiers and Challenges, Bangkok, Thailand, 8-12 November, 1999.

 Arditi D. and Nawakorawit, M., Designing Buildings for Maintenance Using Property Managers’ Input, Proceedings of the International Association of Bridge and Structural Engineers (IABSE) Symposium on Structures for the Future – The Search for Quality, Rio de Janeiro, Brazil, August 25-27, 1999.

 Arditi D. and Nawakorawit, M., Designing Buildings for Maintenance, Proceedings of the NeoCon World’s Trade Conference , Chicago, IL, June 7-9, 1999.

 Arditi, D., Recent Developments in Construction Management Research, Invited keynote lecture, Proceedings of First National Congress of Project Management, Istanbul, Turkey, April 29-30, 1999.

 Arditi D. and Nawakorawit, M., Designing Buildings for Maintenance, Facilities Management and Maintenance, Proceedings of the International Symposium on Management, Maintenance and Modernization of Building Facilities, Singapore, November 18-20, 1998.

 Arditi, D. and Nalbantgil, E., Perception of Trends in Intelligent Building Development, Proceedings of the Second International Congress on Intelligent Buildings, Haifa, Israel, March 4-6, 1997.

 Arditi, D. and Messiha, H.M., Issues Involved in Using Life-Cycle Costing in the Economic Evaluation of Infrastructure Projects, Proceedings of the International Conference on Urban Engineering in Asian Countries in the 21st Century, Bangkok, Thailand, November 5-7, 1996,

 Arditi, D. and Gunaydin, H.M., Total Quality Management in the Home Building Process, Proceedings of the XXIVth IAHS World Congress on Housing, International Association of Housing Science, Ankara, Turkey, May 27 - June 1, 1996.

 Arditi, D., Rojas_Aburto, S., and Abbassi, A.A., CASSEX - An Expert System for Construction Accounting Software Selection, Proceedings of the International Symposium on Artificial Intelligence , Monterrey, Mexico, October 17-20, 1995.

 Arditi, D., Tunca, A.A., and Yuyan, R., Analysis of Construction Claims that Lead to Litigation, Proceedings of the International Symposium of INTERNET and SOVNET on Modern Project management, St. Petersburg, Russia, 14-16 September 1995.

 Arditi, D. and Messiha, H.M., Issues in Implementing Life-Cycle Costing Analysis (LCCA) in Construction Projects, Proceedings of Second International Exhibit and Conference for Building and Construction, Interbuild 95, Cairo, Egypt, June 21-25, 1995.

 Abbassi, A.A. and Arditi, D., Case Based Reasoning and its Potential in Construction, Proceedings of Second International Exhibit and Conference for Building and Construction, Interbuild 95, Cairo, Egypt, June 21-25, 1995.

 Abbassi, A. and Arditi, D., Dispute Prevention and Claim management Using DPES, Proceedings of the International Conference on C