Contents
Refereed papers in
Conference Proceedings
Proceedings, Reports,
Manuals and Articles
Papers Presented at
Conferences with no Proceedings
![]()
Ozorhon,
B., Arditi, D., Dikmen, I. and Birgonul, M.T., Implications of Culture in the
Performance of International Construction Joint ventures, Journal of
Construction Engineering and Management, ASCE, accepted for
publication, 2007.
Ozorhon,
B., Arditi, D., Dikmen, I. and Birgonul, M.T., The Role of Organizational
Culture in Construction Company Alliances, International
Journal of Human Resources Development and Management, accepted for publication, 2007.
Dogan,
S.Z., Arditi, D. and Gunaydin, H.M., Using Decision Trees for Determining
Attribute Weights in a Case-Based Model for Early Cost Detection, Journal of
Construction Engineering and Management, ASCE, accepted for
publication, 2007.
Arditi,
D. and Pattanakitchamroon, T., Analysis Methods in Time-Based Claims, Journal of
Construction Engineering and Management, ASCE, accepted for
publication, 2007.
Ozorhon, B., Arditi, D., Dikmen, I, and Birgonul, M.T., Effect of Host Country and
Project Conditions in International Construction Joint Ventures, International Journal of Project Management,
accepted for publication, 2007.
Ozorhon, B., Arditi, D., Dikmen, I, and Birgonul, M.T., Effect of Partner Fit in International
Construction Joint Ventures, Journal of Management in Engineering, ASCE, Vol. 24, No. 1, January
2008, pp: 12-20.
Algarni,
A.M., Arditi, D. and Polat, G., Build-Operate-Transfer (BOT) in Infrastructure
Projects in the United States, Journal of Construction Engineering and Management,
ASCE, Vol. 133, No. 10, October 2007, pp: 728-735.
Arditi, D., Lee, D.-E. and Polat G., Fatal
Accidents in Nighttime vs. Daytime Highway Construction Work Zones, Journal of Safety Research, Vol. 38, No. 4, 2007, pp: 399-405.
Gunhan, S. and Arditi, D., Budgeting Owner's Construction
Contingency, Journal of
Construction Engineering and Management, ASCE, Vol. 133, No. 7, July 2007,
pp: 492-497.
Gunhan, S., Arditi, D. and Doyle, J., Avoiding Change
Orders in Public School Construction, Journal
of Professional Issues in Engineering Education and Practice, Vol. 133, No.
1, January 2007, pp: 67-73.
Polat, G., Arditi, D. and Mungen, U., A Simulation-Based Decision Support
System for Economical Supply Chain Management of Rebar, Journal of Construction Engineering and Management, ASCE, Vol. 133,
No. 1, January 2007, pp: 29-39.
Tokdemir, O.B., Arditi, D. and Balcik, C., ALISS:
Advanced Linear Scheduling System, Construction
Management and Economics, Vol. 24, No. 12, December 2006, pp: 1253-1267.
Polat, G., Arditi, D., Ballard, G. and Mungen, U.,
Economics of On-Site vs. Off-Site Fabrication of Rebar, Construction Management and Economics, Vo. 24, No. 11, November
2006, pp: 1185-1198.
Gunhan, S. and
Arditi, D., Methods of Entry into the International Construction Market, Yapi, No. 299, October 2006, pp: 82-85
(in Turkish).
Dogan, S.Z., Arditi, D. and Gunaydin, H.M., Determining Attribute Weights in a CBR
Model for Early Cost Prediction of Structural Systems, Journal of Construction Engineering and Management, ASCE, Vol. 132,
No. 10, October 2006, pp: 1092-1098.
Poku, S. and Arditi, D., Construction Scheduling and Progress Control Using
Geographical Information Systems, Journal of Computing in Civil Engineering, ASCE, Vol. 20, No. 5, September/October
2006, pp: 351-360.
Bolukbasi, M.M., Arditi, D. and Mohammadi, J., Optimum
Rehabilitation Schedule of Steel Highway Bridges, Structure and Infrastructure Engineering, Vol. 2, No. 2, June 2006,
pp: 141-152.
Kale, S. and Arditi, D., Diffusion of ISO 9000
Certification in the Precast Concrete Industry, Construction Management and Economics, Vol. 24, No. 5, May 2006,
pp: 485-495.
Lee,
D.-E. and Arditi, D., Automated Statistical Analysis in Stochastic Project
Scheduling Simulation, Journal of
Construction Engineering and Management, ASCE, Vol. 132, No. 3, March 2006,
pp: 268-277.
Bolukbasi,
M.M., Arditi, D. and Mohammadi, J., Deterioration of Reconstructed Bridge Decks,
Structure and Infrastructure Engineering,
Vol. 2, No. 1, March 2006, pp: 23-31.
Arditi, D. and Pattanakitchamroon, T., Selecting a Delay
Analysis Method in Resolving Construction Claims, International Journal of Project Management, Vol. 24, No. 2,
February 2006, pp: 145-155.
Lee, D.-E. and Arditi, D., Total Quality Performance of
Design/Build Firms Using Quality Function Deployment, Journal of Construction Engineering and Management, ASCE, Vol. 132,
No. 1, January 2006, pp: 49-57.
Arditi, D.,
Ayrancioglu, M. and Shi, J.J., Worker Safety Issues in Nighttime Highway
Construction, Engineering, Construction
and Architectural Management, Vol. 12, No. 5, 2005, pp: 487-501.
Kale, S.
and Arditi, D., Diffusion of Computer Aided Design (CAD) Technology in
Architectural Design Practice, Journal of
Construction Engineering and Management, ASCE, Vol. 131, No. 10, October
2005, pp: 1135-1141.
Arditi, D.
and Pulket, T., Predicting the Outcome of Construction Litigation Using
Boosted Decision Trees, Journal of
Computing in Civil Engineering, ASCE, Vol. 19, No. 4, October 2005, pp:
387-393.
Acar, E., Kocak, I., Sey, Y. and Arditi, D.,
Use of Information and Communication Technologies by SMEs in Building
Construction, Construction Management and
Economics, Vol. 23, No. 7, September 2005, pp: 713-722.
Polat, G.
and Arditi, D., The JIT Material Management System in Developing
Countries, Construction Management and Economics, Vol. 23, No. 7, September 2005, pp: 697-712.
Al-Sobiei,
O. S., Arditi, D. and Polat, G., Managing Owner’s Risk of Contractor Default, Journal of Construction Engineering and
Management, ASCE, Vol. 131, No. 9, September 2005, pp: 973-978.
Arditi, D.
and Chotibhongs, R., Issues in Subcontracting Practice, Journal of Construction Engineering and Management, ASCE, Vol. 131,
No. 8, August 2005, pp: 866-876.
Gunhan, S.
and Arditi D., Foreign Market Entry Decision Model for Construction
Companies, Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 8, August 2005, pp: 928-937.
Gunhan, S.
and Arditi , D., Factors Affecting International Construction, Journal of Construction Engineering and
Management, ASCE, Vol. 131, No. 3,
March 2005, pp: 273-282.
Al-Sobiei,
O.S., Arditi, D. and Polat, G., Predicting the Risk of Contractor
Default in Saudi Arabia Utilizing ANN/GA Techniques, Construction Management and
Economics, Vol. 23, No. 4, May
2004, pp: 423-430.
Koksal, A.
and Arditi, D., Predicting Construction Company Decline, Journal of Construction Engineering and Management, ASCE, Vol. 130,
No. 6, November/December 2004, pp: 799-807.
Arditi, D.
Ayrancioglu, M. and Shi, J., Effectiveness of Safety Vests in Nighttime Highway
Construction, Journal of Transportation
Engineering, ASCE, Vol. 130, No. 6, November/December 2004, pp: 725-732.
Koksal A.
and Arditi, D., An Input Output Model for Business Failures in the Construction
Industry, Journal of Construction
Research, Vol. 5, No. 1, March 2004, pp: 1-16.
Arditi, D.
and Lee, D.-E., Service Quality Performance of Design/Build Contractors Using
Quality Function Deployment, Construction
Management and Economics, Vol. 22, No. 2, February 2004, pp: 123-127.
Kanoglu, A.
and Arditi, D., An Integrated Automation System for Design/Build
Organizations, International Journal of
Computer Applications in Technology, Vol. 20, No. 1/2/3, 2004, pp: 3-14.
Bolukbasi,
M.M., Mohammadi, J. and Arditi, D., Estimating the Future Condition of
Highway Bridge Components Using National Bridge Inventory (NBI) Data, Practice Periodical on Structural Design and
Construction, ASCE, Vol. 9, No. 1, February 2004, pp: 16-25.
Abeid, J., Allouche, E., Arditi, D. and Hayman, M., PHOTO-NET II: A
Computer Based Monitoring System Applied to Project Management, Automation in Construction, Vol. 12, No.
5, September 2003, pp: 603-616.
Abeid, J. and Arditi, D., PHOTO-NET: An Integrated System
for Controlling Construction Progress, Engineering,
Construction and Architectural Management, Vol. 10, No.3, 2003, pp:
162-171.
Kale, S.
and Arditi, D., Differentiation, Conformity and Construction Firm Performance, Journal of Management in Engineering,
ASCE, Vol. 19, No. 2, April 2003, pp: 52-59.
Arditi, D.
and Lee, D.-E., Assessing the Corporate Service Quality of Design/Build
Contractors Using Quality Function Deployment, Construction Management and Economics, Vol. 21, No. 2,
February-March 2003, pp: 175-185.
Abeid Neto,
J. and Arditi, D., Time-Lapse Digital Photography Applied to Project
Management, Journal of Construction Engineering and Management, ASCE,
Vol. 128, No. 6, November/December 2002, pp: 530-535.
Arditi, D.,
Tokdemir, O.B. and Suh, K., Challenges in Line-of-Balance Scheduling, Journal
of Construction Engineering and Management, ASCE, Vol. 128, No. 6,
November/December 2002, pp: 545-556.
Arditi, D.,
Alnajjar, A. and Vingert, N., Construction Cost Estimating Support System, Cost Engineering, AACE, Vol. 44, No. 10,
October 2002, pp: 17-25.
Abeid, J.
and Arditi, D., Linking Time-Lapse Digital Photography and Dynamic Scheduling
of Construction Operations, Journal of
Computing in Civil Engineering, ASCE, Vol. 16, No. 4, October 2002, pp:
269-279.
Arditi, D.,
Sikangwan, P. and Tokdemir, O.B., Scheduling System for High Rise Building
Construction, Construction Management and Economics, Vol. 20, No. 4,
June 2002, pp: 353-364.
Kale, S.
and Arditi, D., Competitive Positioning in the U.S. Construction Industry, Journal
of Construction Engineering and Management, ASCE, Vol. 128, No. 3,
May/June 2002, pp: 238-247.
Yasamis,
F., Arditi, D. and Mohammadi, J., Assessing Contractor Quality Performance, Construction
Management and Economics, Vol. 20, No. 3, April-May 2002, pp: 211-223.
Arditi, D.,
Elhassan, A. and Toklu, Y.C., Constructability Analysis in the Design Firm, Journal of Construction Engineering and
Management, ASCE, Vol. 128, No. 2, March/April 2002, pp: 117-126.
Abeid Neto,
J. and Arditi, D., Using Colors to Detect Structural Components in Digital
Pictures, Computer-Aided Civil and Infrastructure Engineering, Vol. 17,
No. 1, January 2002, pp: 61-67.
Gunaydin, H.M. and Arditi, D., Chapter 26 -
Cross Impact Analysis of Information Technologies and Project Management
Knowledge Areas in the Building Design Process, in The Frontiers of Project
Management Research, co-edited by Slevin, D.P., Cleland, D.I. and Pinto,
J.K., Project Management Institute, Newtown Square, PA, 2002, pp: 435-454.
Kurra, S. and Arditi, D., Determination of
Sound Transmission Loss of Multilayared Elements Part 1: Predicted and Measured
Results, Acta Acustica, Vol. 87, No. 5, 2001, pp: 582-592.
Kurra, S. and Arditi, D., Determination of
Sound Transmission Loss of Multilayared Elements Part 2: An Experimental Study, Acta
Acustica, Vol. 87, No. 5, 2001, pp: 592-604.
Kale, S. and Arditi, D., General Contractors Relationships with Subcontractors: A
Strategic Asset, Construction Management and Economics, Vol. 19, No. 5,
September 2001, pp: 541-549.
Mochtar, K. and Arditi, D., Pricing Strategy
in the U.S. Construction Industry, Construction Management and Economics
, Vol. 19, No. 4, July 2001, pp: 405-415.
Mochtar, K. and Arditi, D., Role of Marketing
Intelligence in Making Pricing Policy in Construction, Journal of Management
in Engineering, ASCE, Vol. 17, No. 3, July 2001, pp: 140-148.
Arditi, D., Tokdemir, O.B. and Suh, K., Effect
of Learning on Line-of-Balance Scheduling, International Journal of Project
Management, Vol. 19, No. 5, July 2001, pp: 265-277.
Arditi, D., Tokdemir, O.B. and Suh, K.,
Scheduling System for Repetitive Unit Construction Using Line-of-Balance
Technology, Engineering, Construction and Architectural Management, Vol.
8, No. 2, April 2001, pp: 90-103.
Kanoglu, A. and Arditi, D., A Computer-Based
Information System for Architectural Design Offices, Construction Innovation
, Vol. 1, No. 1, March 2001, pp: 15-29.
Shi, J.J., Cheung, S.O. and Arditi, D., A
Construction Delay Computation Method, Journal of Construction Engineering
and Management , ASCE, Vol. 127, No. 1, January/February 2001, pp: 60-65.
Arditi, D., Ergin, U. and Gunhan, S., Factors
Affecting the Use of Precast Concrete Systems, Journal of Architectural
Engineering, ASCE, Vol. 6, No. 3, September 2000, pp: 79-86.
Tangkar, M. and Arditi, D., Innovation in the
Construction Industry, Dimensi Teknik Sipil Journal of Civil
Engineering Science and Technology, Vol. 2, No. 2, September 2000, pp:
96-103.
Arditi, D., Koksal, A. and Kale, S., Business
Failures in the Construction Industry, Engineering Construction and
Architectural Management, Vol. 7, No. 2, June 2000, pp: 120-132.
Mochtar, K.and Arditi, D., Alternate Pricing
Strategies in Construction, Dimensi Teknik Sipil Journal of Civil
Engineering Science and Technology, Vol. 2, No. 1, March 2000, pp: 56-64.
Arditi, D. and Mochtar, K., Trends in
Productivity Improvement in the U.S. Construction Industry, Construction
Management and Economics, Vol. 18, No. 1, January-February 2000, pp: 15-27.
Arditi, D. and Mochtar, K., Productivity
Improvement in the U.S. Construction Industry, Jurnal Teknik Sipil dan
Perencanaan, Vol. 1, No. 3, December 1999, pp: 1-20.
Arditi, D. and Nawakorawit, M., Designing
Buildings for Maintenance: Designers Perspective, Journal of
Architectural Engineering , ASCE, Vol. 5, No. 4, December 1999, pp:
107-116.
Arditi, D. and Nawakorawit, M., Issues in
Building Maintenance: Property Managers Perspective, Journal of
Architectural Engineering, ASCE, Vol. 5, No. 4, December 1999, pp: 117-132.
Arditi, D. and Tokdemir, O.B., Using Case
Based Reasoning to Predict the Outcome of Construction Litigation, Journal
of Computer Aided Civil and Infrastructure Engineering, Vol. 14, No. 5,
September 1999, pp: 385-393.
Kale, S. and Arditi, D., Age-Dependent
Business Failures in the
Arditi, D. and Tokdemir, O.B., A Comparison of
Case Based Reasoning and Artificial Neural Networks, Journal of Computing in
Civil Engineering, ASCE, Vol. 13, No. 3, July 1999, pp: 162-169.
Arditi, D. and Messiha, H.M., Life Cycle Cost
Analysis (LCCA) in Municipal Organizations, Journal of Infrastructure
Systems , ASCE, Vol. 5, No. 1, March 1999, pp: 1-10.
Arditi, D. and Gunaydin, H.M., Perceptions of
Process Quality in Building Projects, Journal of Management in Engineering
, ASCE, Vol. 15, No. 2, March/April 1998, pp: 43-53.
Kale, S. and Arditi, D., Business Failures:
Liabilities of Newness, Adolescence and Smallness, Journal of Construction
Engineering and Management, ASCE, Vol. 124, No. 6, November/December 1998,
pp: 458-464.
Arditi, D. and Yasamis, F.,
Incentive/Disincentive Contracts: Perceptions of Owners and Contractors, Journal
of Construction Engineering and Management, ASCE, Vol. 124, No. 5,
September/October 1998, pp: 361-373.
Arditi, D. and Gunaydin, H.M., Factors that
Affect Process Quality in the Life Cycle of Building Projects, Journal of
Construction Engineering and Management, ASCE, Vol. 124, No. 3, May/June
1998, pp: 194-203.
Arditi, D., Oksay, F.E., and Tokdemir, O.B.,
Predicting the Outcome of Construction Litigation Using Neural Networks, Computer-Aided
Civil and Infrastructure Engineering, Vol. 13, No. 2, March 1998, pp:
75-81.
Arditi, D., Kale, S., and Tangkar, M.,
Innovation in Construction Equipment and its Flow into the Construction
Industry, Journal of Construction Engineering and Management, ASCE, Vol.
123, No. 4, December 1997, pp: 371-378.
Arditi, D., Khisty, C.J., and Yasamis, F.,
Incentive/Disincentive Provisions in Highway Contracts, Journal of
Construction Engineering and Management, ASCE, Vol. 123, No. 3, September
1997, pp: 302-307.
Arditi, D. and Gunaydin, H.M., Total Quality
Management in the Home Building Process, International Journal for Housing
Science and Its Applications, Vol. 21, No. 1, January 1997, pp: 1-10.
Arditi, D. and Gunaydin, H.M., Total Quality
Management in the Construction Sector, Technical Journal, Vol. 8, No. 1,
January 1997.
Arditi, D. and Tokdemir, B.O., A New Approach
to Civil Engineering Applications: Case Base Reasoning, Turkish Engineering
News, Vol. 42, No. 387, March 1997, pp: 36-40.
Arditi, D. and Alifen, R., Value Engineering
in Construction Management, Value World, SAVE, Vol. 19, No. 3, October
1996, pp: 1-7.
Arditi, D. and Gunaydin, H.M., Total Quality
Management in the Construction Process, International Journal of Project
Management, Vol. 15, No. 4, August 1996, pp: 235-243.
Al-Sobiei, O.S., Assaf, S. and Arditi, D.,
Construction Claims in Residential Projects in Saudi Arabia, International
Journal of Housing Science and its Applications, Vol. 20, No. 1, 1996.
Arditi, D. and Ferreira, E., Acquisition,
Representation and Validation of Knowledge of Subjective Nature in Expert
System Development, Microcomputers in Civil Engineering, Vol. 11, No. 4,
July 1996, pp: 239-248.
Arditi, D. and Bentotage, S.B., System for
Scheduling Highway Construction Projects, Microcomputers in Civil
Engineering , Vol 11, No. 2, March 1996, pp: 123-139.
Arditi, D. and Messiha, H., Life-Cycle Costing
in Municipal Projects, Journal of Infrastructure Systems, ASCE, Vol. 2,
No. 1, March 1996, pp: 5-14.
Arditi, D. and Mochtar, K., Productivity
Improvement in the Indonesian Construction Industry, Construction Management
and Economics , Vol. 14, No. 1, January 1996, pp: 13-24.
Arditi, D. and Gunaydin, H.M., Total Quality
Management, Tasarim, Vol. 6, No. 58, 1996, pp: 92-95 (in Turkish).
Arditi, D., Khisty, C.J., and Yasamis, F.,
Incentive/Disincentive Provisions in Highway Contracts, Transportation Research
Board, 75th Annual Meeting,
Arditi, D. and Mochtar, K., Productivity in
the Construction Industry, International Productivity Journal, Vol.
1995-I, Spring 1995, pp: 37-48.
Riad, N.I., Arditi, D., and Mohammadi, J.,
Computerized Time Impact Analysis for Project Acceleration, Microcomputers
in Civil Engineering, Vol. 10, No. 2, March 1995, pp: 131-146.
Arditi, D. and Robinson M.A., Concurrent
Delays in Construction Litigation, Cost Engineering, AACE, Vol. 37, No.
7, July 1995, pp: 20-31.
Riad, N.I., Arditi, D., and Mohammadi, J.,
Integrated System for Managing Owner-Directed Project Acceleration, Journal
of Construction Engineering and Management, ASCE, Vol. 120, No. 1, March
1994, pp: 77-95.
Hisatomi, Y., Reismann, W., with the
contribution of Arditi, D., Domsa, J., Schub, A., and Vos, C.J., Design and
Construct: Trend, Challenge, Improvement?, Structural Engineering
International , Vol. 4, No. 3, August 1994, pp: 177-182.
Gray, J. and Arditi, D., Fire Prevention and
Protection during Construction, Journal of Applied Fire Science , Vol.
4, No. 1, 1994, pp: 53-68.
Arditi, D., Computerized Repetitive Scheduling
Techniques in
Arditi, D. and Suh, K., Estimating System
Selection Expert, Construction Management and Economics, Vol. 9, No. 4,
July 1991, pp: 369-381.
Arditi, D. and Suh, K., Expert System for Cost
Estimating Software Selection, Cost Engineering, AACE, Vol. 33, No. 6,
June 1991, pp: 9-19.
Arditi, D. and Gutierrez, A.E., Performance of
US Contractors in Foreign Markets, Construction Management and Economics
, Vol 9, No. 5, September 1991, pp: 431-449.
Arditi, D. and Gutierrez, A.E., Factors
Affecting US Contractors' Performance Overseas, Journal of Construction
Engineering and Management, ASCE, Vol. 117, No. 1, March 1991, pp: 27-46.
Arditi, D. and Singh, S., Selection Criteria
for Commercially Available Software in Construction Accounting, International
Journal of Project Management, INTERNET, Vol. 9, No. 1, February 1991, pp:
39-44.
Riad, N., Arditi, D., and Mohammadi, J., A
Conceptual Model for Claim Management in Construction - An AI Approach, Computers
and Structures, Vol. 40, No. 1, 1991, pp: 67-74.
Catakli, M.R. and Arditi, D., An Overview of
Materials Management in Construction Projects, Industrial Engineering ,
Vol. 2, No. 10, June 1991.
Arditi, D., Construction Management Education
in Turkey, International Journal of Construction Management, INTERNET,
Invited paper, Vol.7, No. 4, May 1989, pp: 201-204.
Arditi, D. and Patel, B.K., Expert System for
Claim Management in Construction Projects, International Journal of Project
Management, INTERNET, Vol. 7, No. 3, August 1989, pp: 141-146.
Arditi, D. and Patel, B.K., Impact Analysis of
Owner-Directed Acceleration, Journal of Construction Engineering and
Management, ASCE, Vol. 115, No. 1, March 1989, pp: 144-157.
Arditi, D. and Davis, L., Marketing of
Construction Services, Journal of Management in Engineering, ASCE, Vol.
4, No. 4, October 1988, pp: 297-315.
Arditi, D. and Riad, N., Commercially
Available Estimating Software Systems, Project Management Journal, PMI,
Vol. 19, No. 2, April 1988, pp: 65-70.
Arditi, D. and Albulak, M.Z., Line-of-Balance
Scheduling in Pavement Construction, Journal of Construction Engineering and
Management, ASCE, Vol. 112, No. 3, September 1986, pp: 411-424.
Arditi, D. and Rackas, A., Software Needs for
Construction Planning and Scheduling, International Journal of Project
Management, INTERNET, Vol. 4, No. 2, May 1986, pp: 91-96.
Arditi, D., Akan, G.T., and Gurdamar, S.,
Reasons for Cost Overruns in Public Projects, International Journal of
Project Management, INTERNET, Vol. 3, No. 4, November 1985, pp: 218-224.
Arditi, D., Akan, G.T., and Gurdamar, S.,
Reasons for Delays in Public Projects in Turkey, Construction Management and
Economics , Vol. 3, No. 2, Autumn 1985, pp: 171-181.
Arditi, D. and Krieter, D.S., Railway Route
Rationalization - A Valuation Model, Journal of Transportation Engineering
, ASCE, Vol. 111, No. 2, March 1985, pp: 105-113.
Arditi, D., Construction Productivity
Improvement, Journal of Construction Engineering and Management, ASCE,
Vol. 111, No. 1, March 1985, pp: 1-14.
Arditi, D., Graduate Education in Construction
Management, Construction Management and Economics, Vol. 2, No. 3, Winter
1984, pp: 193-199.
Akan, G.T., Arditi, D., and Imre, M., Priority
Ranking of Highway Improvement Projects, Construction Management and
Economics , Vol. 2, No. 1, Spring 1984, pp: 49-55.
Arditi, D. and Koseoglu, H., Factors Affecting
Success in Network Applications in a Developing Country, Construction
Management and Economics, Vol. 1, No. 1, Spring 1983, pp: 3-16.
Arditi, D., Diffusion of Network Planning in
Construction, Journal of Construction Engineering and Management , ASCE,
Vol.109, No. 1, March 1983, pp: 1-12.
![]()
Refereed Papers in Conference Proceedings
Arditi, D., Innovative 4D Management of Construction
Projects, Proceedings of the 5th
International Conference on Innovation in Architecture, Engineering and
Construction, Antalya, Turkey, 23-25 June 2008.
Arditi, D., Managing the Risk of Contractor Default, Proceedings of the Eighth National Project
Management Congress, Kadir Has University, Istanbul, Turkey, April 13-14,
2007.
Ozorhon, B. and Arditi, D., Electronic Reverse Auctions
in Construction Procurement, Proceedings
of the Fourth International Structural Engineering and Construction Conference
(ISEC-4), Melbourne, Australia, September 26-28, 2007.
Gunhan, S. and Arditi, D., Foreign Market Entry Modes in
Construction, Proceedings of the ASCE
Construction Research Congress, ASCE and CIB, Grand Bahama Island, Bahamas,
6-8 May, 2007.
Oney-Yazici,
E., Arditi, D. and Uwakweh, B.O., Organizational Culture in U.S. Construction
Companies, Joint International Conference on Construction Culture, Innovation
and Management (CCIM), CIB and CICE, Dubai, UAE, 26-29 November, 2006.
Arditi, D.,
Graduate Education In Construction Management, Workshop on Reforming Civil and
Environmental Engineering Education Given the Societal Changes Related to
Infrastructures, eduCEE’06, sponsored by NSF and TUBITAK, Istanbul, Turkey, 4-7
October 2006.
Arditi, D.,
Artificial Intelligence in Predicting the Outcome of Construction Litigation,
Invited keynote lecture, Proceedings of the
Tenth East Asia-Pacific Conference on Structural Engineering and Construction,
Bangkok, Thailand, 3-5 August 2006.
Dogan,
S.Z., Arditi, D. and Gunaydin, H.M., Comparison of ANN and CBR Models for Early
Cost Prediction of Structural Systems, Proceedings
of the 17th International Conference on the Applications of Computer
Science and Mathematics in Architecture and Civil Engineering, K. Gürlebeck
and C. Könke (Editors), Weimar, Germany, 12-14 July, 2006.
Kaplanoglu,
S.B. and Arditi, D., Pre-Project Peer Reviews in Construction Companies, Proceedings of the Third Construction
Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005,
pp: 115-122.
Dogan,
S.Z., Arditi, D. and Gunaydin, H.M., Comparison of GA-Augmented Neural Networks
and GA-Augmented Case-Based Reasoning Models in Estimating Building Costs, Proceedings of the Third Construction
Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005,
pp: 286-295.
Gunhan, S.
and Arditi, D., External Factors Affecting Construction Companies in
International Markets, Proceedings of the
Third Construction Management Congress, IMO, Izmir, Turkey, September 29 –
October 1, 2005, pp: 78-89.
Polat, G.,
Arditi, D. and Mungen, U., Just-in-Time Materials Management Systems in
Developing Countries, Proceedings of the
Third Construction Management Congress, IMO, Izmir, Turkey, September 29 –
October 1, 2005, pp: 263-271.
Toklu,
Y.C., Arditi, D. and Cotuk, A., Problems Encountered in Traditional Project
Scheduling and their Solutions, Proceedings
of the Third Construction Management Congress, IMO, Izmir, Turkey,
September 29 – October 1, 2005, pp: 272-285.
Erik, E.,
Arditi, D. and Koksal, A., Bribing Cases in the Construction Industry, Proceedings of the Third Construction
Management Congress, IMO, Izmir, Turkey, September 29 – October 1, 2005,
pp: 508-518.
Arditi, D., Predicting the Outcome of
Construction Litigation, Invited keynote lecture, Proceedings of the Fifth
International Conference on Advances in Civil Engineering,
Celik, T., Arditi, D. and Abbasi, M., Labor
Practices in the U.S. Construction Industry, Proceedings of the Fifth
International Conference on Advances in Civil Engineering, Istanbul, Turkey,
25-27 September 2002.
Arditi D., Goren, A. and Tangkar, M.,
Automation and Robotics in the Construction Industry, Proceedings of the
International Conference on Advancement in Design, Construction, Construction
Management and Maintenance of Building Structures, Bali, Indonesia, 27-28 March
2002.
Arditi, D. and Siawidjaja, R. Safety Equipment
in the Construction Site, Proceedings of the International Conference on
Advancement in Design, Construction, Construction Management and Maintenance of
Building Structures, Bali, Indonesia, 27-28 March 2002.
Kurra, S. and Arditi, D., Variation of the
Measured Sound Insulation Values for Test Walls in Two Different Sizes, Proceedings
of the 17th ICA Conference , Rome, Italy, September 2001.
Arditi, D., Recent Research in Construction
Management, Invited key-note lecture, Proceedings of the Fourth
International Congress on Advances in Civil Engineering, Famagusta, Cyprus,
November 1-3, 2000.
Koksal, A. and Arditi, D., Comparing Models of
Construction Company Failure, Proceedings of the Fourth International
Congress on Advances in Civil Engineering, Famagusta, Cyprus, November 1-3,
2000.
Gunaydin, H.M. and Arditi, D., Impact of
Information Technologies on Project Management Functions in the Building Design
Process, Proceedings of the PMI Research Conference,
Kurra, S. and Arditi, D., Sound Transmission
Loss of Multilayered Elements: Comparison of Calculated and Measured Results, Proceedings
of Inter.Noise 2000, the 29th International Congress on Noise Control
Engineering, Nice, France, August 27-30, 2000.
Arditi, D., Catakli, M.R., Saemundsson, G.,
Akyol, G. and Gunhan, S., Historical Analysis of U.S. Firms CM Activities
in Global Markets, Proceedings of the Civil and Environmental Engineering
Conference New Frontiers and Challenges,
Arditi D. and Nawakorawit, M., Designing
Buildings for Maintenance Using Property Managers Input, Proceedings
of the International Association of Bridge and Structural Engineers (IABSE)
Symposium on Structures for the Future The Search for Quality, Rio
de Janeiro, Brazil, August 25-27, 1999.
Arditi D. and Nawakorawit, M., Designing
Buildings for Maintenance, Proceedings of the NeoCon Worlds Trade
Conference ,
Arditi, D., Recent Developments in
Construction Management Research, Invited keynote lecture, Proceedings of
First National Congress of Project Management, Istanbul, Turkey, April
29-30, 1999.
Arditi D. and Nawakorawit, M., Designing
Buildings for Maintenance, Facilities Management and Maintenance, Proceedings
of the International Symposium on Management, Maintenance and Modernization of
Building Facilities, Singapore, November 18-20, 1998.
Arditi, D. and Nalbantgil, E., Perception of
Trends in Intelligent Building Development, Proceedings of the Second
International Congress on Intelligent Buildings, Haifa, Israel, March 4-6,
1997.
Arditi, D. and Messiha, H.M., Issues Involved
in Using Life-Cycle Costing in the Economic Evaluation of Infrastructure
Projects, Proceedings of the International Conference on Urban Engineering
in Asian Countries in the 21st Century, Bangkok, Thailand, November 5-7,
1996,
Arditi, D. and Gunaydin, H.M., Total Quality
Management in the Home Building Process, Proceedings of the XXIVth IAHS
World Congress on Housing, International Association of Housing Science,
Ankara, Turkey, May 27 - June 1, 1996.
Arditi, D., Rojas_Aburto, S., and Abbassi,
A.A., CASSEX - An Expert System for Construction Accounting Software Selection,
Proceedings of the International Symposium on Artificial Intelligence ,
Monterrey, Mexico, October 17-20, 1995.
Arditi, D., Tunca, A.A., and Yuyan, R.,
Analysis of Construction Claims that Lead to Litigation, Proceedings of the
International Symposium of INTERNET and SOVNET on Modern Project management,
St. Petersburg, Russia, 14-16 September 1995.
Arditi, D. and Messiha, H.M., Issues in
Implementing Life-Cycle Costing Analysis (LCCA) in Construction Projects, Proceedings
of Second International Exhibit and Conference for Building and Construction,
Interbuild 95, Cairo, Egypt, June 21-25, 1995.
Abbassi, A.A. and Arditi, D., Case Based
Reasoning and its Potential in Construction, Proceedings of Second
International Exhibit and Conference for Building and Construction,
Interbuild 95, Cairo, Egypt, June 21-25, 1995.
Abbassi, A. and Arditi, D., Dispute Prevention
and Claim management Using DPES, Proceedings of the International Conference
on C